June 12, 2011

Putting up the cover

We spent all day yesterday putting up the cover that is going to keep the rain off the boat while it is hauled out. This will allow us to sand blast, paint and weld regardless of the weather.  It was pretty impressive to see this thing go up!  I'm hoping to be able to salvage some of the plastic to make a green house next year.  Not sure what we'll do with all of the conduit though!  As you can see from the pictures we were a little short on the sides.  I'm told that when I go back tomorrow I'll see that the guys added additional tarps and the excess plastic to either side.  The guys got that finished after I left today.

Jim & Brenda getting the conduit ready

Sean cutting up some wood

Val & Brenda supervising ;)

Putting up the conduit

Feeding the conduit through the 2x4's

Gettin 'er done!


Conduit ribs up

Framing in the bow


Looks a little like a circus act!

Pulling the plastic over

Trying to get it over the top.  Paul walked that boom like a balance beam all afternoon

Of course the wind blew the whole time!

Finally covered!

View from inside

Rolling up the excess

Finished!

Back to May...

Before we headed out to Taku Harbor for Memorial Weekend we took the bow gates down to the crane to lower them onto the SHAD.  I left my camera on the boat and only had my iPhone on me to take these pictures.  I just got around to uploading them to the computer.  Dave operated the crane, Emmett manuvered the gates into place and I was on the dock contemplating how I was going to get down the ladder after my close call from the week before at the grid.

Lowering one of the gates. 

Coming down...

Just about there...

We're in there!

June 2, 2011

Haul Out, FINALLY!

Found out last night after work that we would have to either pull the boat today or pull it in two weeks and risk not getting out of the yard before July 1st.  Needless to say we chose to haul out today.  This turned into a much bigger ordeal than I had imagined.  We were to be at the yard by 2pm; little did we know that they had to pick up a tugboat, set it on a barge and move the barge out of the way so we could get in.  That took about an hour and a half.  During this time I was in the yard and Dave and his brother Matt were out in the channel waiting to come in.  They also had to move the crane into place.

I was a little worried when I saw them jump starting the crane!

Dave and Matt staging in the channel

Moving the tug out of the way

Getting the straps ready

Coming in

Dave came in bow first, but had to turn around in order to be pointed in the right direction


Securing the straps


Setting up the blocks

Bringing in more blocks
Up we go!



Wow!

Swinging 'er into place

Lining 'er up

Setting 'er down

Making an adjustment

Just another shove

Touchdown!

Memorial Weekend

We decided that since we weren't able to get hauled out before Memorial Weekend, we'd go ahead and do our annual trip to Taku Harbor with our boating friends.  We had a blast!  The SHAD handled well and for the first time in a while I was warm, dry and slept well while boat camping.  I have to say she was the talk of the dock while we were out there.  

Dave and the guys built a canopy over the bow so we'd have somewhere dry to be if it started raining and it turned into quite the party pad!  I think we blew everyone away when we brought out the fire pit and had a toasty campfire on the bow!

So the question of the hour is how long did it take us to get out there?  Well, I think we were cruising around 5kts, which got us out there in about 3 hours 45 minutes.  Not too bad.

Heading towards Arden

Party barge at the dock


Fire pit on the bow
Looking towards the Taku Harbor dock from my kayak

Sunday night at the harbor

Monday morning at the harbor

Tiger Olsen cabins

SHAD at the dock

Dungeness Crab

Improvised cobbler by Brenda.  It was awesome!

Steak dinner

Cruising past the dock

This pretty much sums up my ride home!