June 9, 2012

Made A Lot Of Progress This Weekend

We've really made a lot of progress this weekend and I can finally see the light at the end of the tunnel!

We tore down all of the Formica in the galley area.  This will be replaced with a brite white formica.

Formica removed from the engine room door

Formica removed from the galley

Formica removed from the galley

Dave installed a pump to suck the warm air out from above the stove to the head, so now We'll have heat in the head!  YAY!!  The hose runs from the water heater closet, through the wheelhouse into the head.

Heater hose through the water heater closet
We were able to install two of the three 12 volt L.E.D. lights for the galley area.  We're still waiting for Western Auto to get the third light in.  Hopefully the light will be here in the next week!

12 volt L.E.D. light

12 volt L.E.D. light
I can finally say we have one entire area of the boat finished!!  The Captain's bunk is now DONE!!!  We added the trim around the windows, which finished out that area.  I am so excied to finally have at least one area completely finished!!!

Captain's bunk, DONE!
The trim is now up all around the hatch through the wheelhouse roof. 

Trim around the hatch
~Misty~